News Detail

Construction reroutes end for Routes 9 & 22

UPDATE JUNE 22, 2018:

The construction on Washington Street is complete and RTA Routes 9 and 22 will return to regular service stops on Sunday, June 24, 2018.

----------------------------------------------------------------------------------

The Greater Dayton RTA periodically adjusts bus service in response to scheduled major construction projects. Beginning Sunday, June 3, the RTA routes 9 and 22 will detour for construction on Washington Street.

Route 9: A detour for city of Dayton road construction on Washington Street will be in effect. During the detour, two temporary stops will be added on Longworth Street and the bus stops at Washington at Ludlow (Stop IDs: 869 and 819) and the stop Washington at Longworth (6997) will be closed for the duration of the detour. All trips servicing Main and Franklin will be adjusted by 1 to 2 minutes.

Route 22: A detour for city of Dayton road construction on Washington Street will be in effect. During the detour, two temporary stops will be added on Longworth Street and the northbound bus stop at Washington at Ludlow (Stop ID: 869) and southbound stops Washington at Ludlow (819) and Washington at Longworth (6997) will be closed for the duration of the detour. All trips times will be adjusted by 1 to 2 minutes during this detour.

For any questions, call our Customer Service Call Center at 937-425-8300.